In 2018, SIPL completed the water-distribution network for Tshongdue, Paro Town (Package III). The system remains operational, demonstrating the durability and reliability of the completed works. Building on this experience, SIPL has delivered numerous water-distribution components, both as standalone assignments and as part of larger irrigation transmission packages.

Let's Start Work Together
Dewa-Ri Building (2nd Floor)
Opposite to RUB Office
Thongsel Lam
Lower Motithang, Thimphu
Copyright © 2026 Shambhala Infra Pvt Ltd